项目展示Project Display

模拟制动试验台

Simulated brake test bench

制动系统测试台用于制动系统的单个零件和连接质量验证。该制动系统测试台可以模拟现实条件下的制动系统,并且更易于更换部件,监控制动系统的性能要比在实际车辆中要好。

The brake system test bench is used for the brake system single part and connection quality validation. The brake system test bench enable simulating the brake system working in the reality condition, and easier to replace the components, monitor the brake system performance than in the real vehicle.

电桩改造项目

Charging pile renovation project

将研发停车场当前使用的电动汽车充电支柱更换为新的充电支柱(由供应商设计并经BBT-E-60 确认),并适用于 B 型 RCD 和断路器的直接安装。此新支柱必须适用安装一个和两个电动汽车充电墙盒。

Exchange of the current used EV(Electric Vehicle)-Charging pillars in the R&D parking lots to new charging pillars (designed by the supplier and confirmed by BBT-E-60), which are suitable for the direct installation of type B RCDs and circuit breakers together. This new pillar must be suitable for the mounting of one and also two EV-Wallboxes.

BBT-E-51直流充电桩项目

BBT-E-51 DC charging pile project

本项目投资用来购买能覆盖国内及出口市场相应标准的大功率充电设施,用来确保所有G08BEV车辆的充电需求。

Investment needed for high power charging facility to cover local and export market charging and to guarantee all G08BEVs daily charging.

汽车生产线安装项目

BIW Euipment Installation project

项目:伟巴斯特C346 生产线

时间201601-12

项目描述 / Project Description:

项目包含,所有的夹具及传输设备的设计及制作。电气部分的整体设计与调试。

Date01-12 ,2016

Project C346 production line

The project includes the design and manufacture of all fixtures and transmission equipment. The overall design and commissioning of the electrical part.

汽车生产线安装项目

BIW Euipment Installation project

项目:米其林轮胎生产线

时间201701-12

项目描述:项目包含,所有的夹具及传输设备的组装调试。

ProjectMichelin tire production line

Date01-12,2017

Project Description: Theproject includes the assembly and commissioning of all fixtures andtransmission equipment.

汽车生产线安装项目

BIW Euipment Installation project

项目:宝马发动机维修工位缸盖下线工装

时间201609-12

项目描述:此项目包含机械结构设计及制作。

ProjectBMW engine repair station cylinder head off-line tooling

Date09-12,2016

Project Description: This project includes mechanical structure design and production.

真空设备改造项目

Vacuum equipment renovation project

时间201509-12

项目描述:201509月起,我公司承接了沈阳恒进真空设备有限公司一台真空设备结构及外观改造。

Date09-12,2015

Project Description: Since September 2015, our company has undertaken a vacuum equipment structure and

appearance modification of Shenyang Hengjin Vacuum Equipment Co., Ltd.

德科(沈阳)斯米尔吸附模具脱模剂设备项目

DRÄXLMAIER Adsorption Mold Release Agent Equipment Project

时间201710-20182

项目描述:项目包含,所有的夹具及传输设备的设计及制作。电气部分的整体设计与调试。

Date10.2017-02.2018

Project Description: The project includes the design and manufacture of all fixtures and transmission

equipment. The overall design and commissioning of the electrical part.

华晨宝马组装车间前脸装配工装国产化

BMW Brilliance Assembly Workshop – Localization of front face assembly tooling

时间20163-12

项目描述:20163月起,我公司承接华晨宝马组装车间

前脸装配工装国产化。

项目包含夹具的制作、安装调试。

Date03-122016

Project Description: Since March 2016, our company has undertaken the localization of front face assembly tooling for the BMW Brilliance assembly workshop.

The project includes the production, installation and commissioning of the fixture.